Meralco Maintenance Schedule for October 23 - 29, 2017

MAINTENANCE SCHEDULE

To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:

MONDAY TO TUESDAY, OCTOBER 23 – 24, 2017

MANILA

BETWEEN 11:00PM AND 11:15PM (MON., 10/23/17) AND THEN BETWEEN 3:45AM AND 4:00AM (TUE., 10/24/17) – PORTION OF CIRCUIT TEGEN 17B

Portion of Romualdez and Natividad A. Lopez Sts. from Meralco – Tegen substation to and including Cabral, Sylvia and T. Ayala Sts. in Paco and Ermita.

Portion of Ayala Blvd. from Natividad A. Lopez St. to near San Marcelino St. in Ermita.

 

BETWEEN 11:00PM (MON., 10/23/17) AND 4:00AM (TUE., 10/24/17) – PORTION OF CIRCUIT TEGEN 17B

Portion of Taft Ave. from Finance St. to Ayala Blvd. in Ermita.

 

REASON:     Line reconductoring works along Taft Ave. cor. Ayala Blvd. in Ermita, Manila.

 

SAN JUAN CITY

BETWEEN 11:00PM (MON., 10/23/17) AND 6:00AM (TUE., 10/24/17) – PORTION OF CIRCUIT VALENCIA 412VAL

Portion of R. Pascual St. from F. Blumentritt St. to Carriedo St. in Bgy. Batis and Tibagan.

Portion of Gen. P. R. Sotto St. from near F. Blumentritt St. to Don. E. Ejercito St. in Bgy. Tibagan.

Portion of Don. E. Ejercito St. from from Gen. P. R. Sotto St. to F. Roxas St. including Kalayaan St. in Bgy. Tibagan.

Portion J. V. Alvior and J. P. Rizal Sts. from Don E. Ejercito St. to and including Cypress St. in Bgys. Tibagan and Onse.

 

REASON:     Line reconductoring works along R. Pascual and J. P. Rizal Sts. in Bgys. Tibagan, Batis and Onse in San Juan City.

 

MANILA (PACO; AND SAN ANDRES BUKID)

BETWEEN 11:30PM AND 11:59PM (MON., 10/23/17) AND THEN BETWEEN 5:00AM AND 5:30AM (TUE., 10/24/17) – PORTIONS OF CIRCUIT PACO 414VY – MALATE 43J

Portion of Peñafrancia St. from Pres. Quirino Ave. to and including San Antonio, Sto. Sepulcro and Pedro Gil Sts. in Paco.

Portion of Diamante St. from San Andres St. to and including Topacio, Alabastro, Zafiro, Rubi, Nakar, Von Grunao, Avadores, De Pinedo and Road 4 in San Andres Bukid.

Portion of G. Del Pilar from Pablo Ocampo Sr. Ave. to and including A. Francisco, Alejo Aquino, Espiritu, F. Torres and Don Pedro Sts. in San Andres.

Portion of Pres. Sergio Osmeña Highway from. Pres. Quirino Ave. in Paco to Pablo Ocampo Sr. Ave. including Perlita St. in San Andres Bukid.

 

BETWEEN 11:30PM (MON., 10/23/17) AND 5:30AM (TUE., 10/24/17) – PORTION OF CIRCUIT PACO 414VY – MALATE 43J

Portion of Pablo Ocampo Sr. Ave. from G. Del Pilar St. to Zobel Roxas St. in San Andres Bukid.

 

REASON:     Relocation of primary facilities affected by Skyway Stage 3 Construction along Pres. Sergio Osmeña Highway in San Andres Bukid, Manila.

 

TUESDAY, OCTOBER 24, 2017

MUNTINLUPA CITY

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT AYALA ALABANG 412WR

Along Doña Anastacia St. from near Don P. Reyes Ave. to and including Camella Ridge Subd., Victoria Homes – Pearl Heights Subd. and portion of Portofino South Subd. in Bgy. Tunasan.

 

REASON:     Replacement of rotten pole and line reconductoring works inside Victoria Homes Subd., Bgy. Tunasan, Muntinlupa City.

 

LAGUNA (CABUYAO)

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT LISP 415ZQ

Portion of Sta. Elena Golf Club including the The Country Club.

 

REASON:     Various line maintenance works in Sta. Elena Golf and Country Club in Bgy. Sta. Elena, Cabuyao, Laguna.

 

CAVITE (DASMARIÑAS CITY; IMUS; AND GEN. TRIAS)

BETWEEN 9:00AM AND 9:30AM AND THEN BETWEEN 3:01PM AND 3:30PM – THE WHOLE OF CIRCUIT ABUBOT 32XZ

Portion of Don Placido Campos Ave. from Goldenville I Subd. to and including Bgys. Malagasang II-F & G in Imus;  Goldenville II Subd., Greensborough Subd.,  Dexterville Classic Subd., Dasmariñas Townsville Subd., Sunndale Homes and Sunrise Hills Subd. in Bgy.Sabang, Dasmariñas City.

Mary Cris Complex in Bgy. Pasong Camachile 2, Gen. Trias.

 

REASON:     Preventive maintenance and testing works inside Meralco – Abubot substation.

CAVITE (GEN. TRIAS)

BETWEEN 9:30AM AND 2:30PM – PORTION OF CIRCUIT GATEWAY 412WP

Portion of GBR Ave. from GBR Museum to Crisanto M. Delos Reyes Ave. in Gateway Business Park, Bgy. Javalera.

 

REASON:     Line reconductoring works inside Gateway Business Park, Bgy Javalera, Gen. Trias, Cavite.

 

WEDNESDAY TO THURSDAY, OCTOBER 25 – 26, 2017

LAGUNA (CALAUAN)

BETWEEN 11:30PM (WED., 10/25/17) AND 4:30AM (THU., 10/26/17) – PORTION OF CIRCUIT DILA 410DIA

Portion of Bay – Calauan Highway from A. Marfori Road to and including Calauan Health Center, Puregold Calauan, H & E Group Inc.; A. Marfori Ext., G. Medel and J. P. Rizal Sts. in Bgys. Poblacion (Kanluran), Poblacion (Silangan) and Masiit.

 

REASON:     Installation and replacement of facilities along Bay – Calauan Highway, Bgy. Poblacion, Calauan, Laguna.

 

TUESDAY TO WEDNESDAY, OCTOBER 24 – 25, 2017

PASIG CITY (KAPITOLYO)

BETWEEN 11:00PM (TUE., 10/24/17) AND 4:00AM (WED., 10/25/17) – PORTION OF CIRCUIT HILLCREST 416VZ

Portion of Pioneer St. from Mercury Group of Companies Compound to and including Philkong Knitting Factory, Puregold Jr., Pioneer Grill and Pioneer Center.

 

REASON:     Installation of additional primary lines along Pioneer St. in Bgy. Kapitolyo, Pasig City.

 

BULACAN (NORZAGARAY)

BETWEEN 11:00PM AND 11:30PM (TUE., 10/24/17) AND THEN BETWEEN 4:30AM AND 5:00AM (WED., 10/25/17) – PORTION OF CIRCUIT SAPANG PALAY 33YO

Portion of Villarama Road from near Marlane Subd. to and including the whole of Bgys. Bigte and Minuyan.

 

BETWEEN 11:00PM (TUE., 10/24/17) AND 5:00AM (WED., 10/25/17) – PORTION OF CIRCUIT SAPANG PALAY 33YO

Portion of San Jose Del Monte – Norzagaray Road from near La Farge Republic Cement (Continental Cement) to and including the whole of Bgy. San Mateo.

 

REASON:     Installation of additional primary lines along San Jose Del Monte – Norzagaray Road in Bgy. San Mateo, Norzagaray, Bulacan.

 

RIZAL PROVINCE (BINANGONAN)

BETWEEN 11:30PM (TUE., 10/24/17) AND 12:01AM (WED., 10/25/17) AND THEN BETWEEN 4:00AM AND 4:30AM (WED., 10/25/17) – PORTION OF CIRCUIT MALAYA 44MM

Portion of Manila East Road from Montevideo Subd. to and including San Juan Heights Subd. in Bgy. Mahabang Parang.

Portion of M. Oja St. from Delos Reyes St. in San Juan Heights Subd. to and including Pumarada Resort; Sitio Tutulo, Westpointe Subd.; and Mesa St. in Bgy. Mahabang Parang.

 

BETWEEN 11:30PM (TUE., 10/24/17) AND 4:30AM (WED., 10/25/17) – PORTION OF CIRCUIT MALAYA 44MM

Portion of Manila East Road from Laguna Lake Development Authority (LLDA) Office to near Montevideo Subd. in Bgy. Mahabang Parang.

 

REASON:     Replacement of ageing pole and line reconductoring works along Manila East Road, Bgy. Mambog, Binangonan, Rizal.

 

WEDNESDAY, OCTOBER 25, 2017

CAVITE (IMUS)

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT BACOOR 423WX

Portion of Balmori and Kalaw Sts. from Aquino to Avenida Rizal in Bahayang Pag-asa, Bgy. Pinagbuklod.

 

REASON:     Various line maintenance works along Avenida Rizal in Bgy. Pinagbuklod, Imus, Cavite.

 

PASAY CITY

BETWEEN 8:00AM AND 8:30AM AND THEN BETWEEN 12:30PM AND 1:00PM – PORTION OF CIRCUIT MALIBAY 413VJ

Along Newport Blvd. from Emperador to and including Remington Hotel, Newport Mall, Resorts World Manila, Manila Marriott Hotel, Marriott Grand Ballroom, Montecito Residential Resort, Sarasota Residential Resort, The Palmtree and Parkside Villas in Newport City.

Portion of Andrews Ave. from Domestic Road to and including Airmen’s Village and PAL Complex.

 

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT MALIBAY 413VJ

Portion of Andrews Ave. from Newport Blvd. to and including Newport City Steel Parking, McDonalds Restaurant, Total Gas Station and Shrine of St. Therese of the Child Jesus Parish Church .

 

REASON:     Relocation and line reconductoring works along Andrews Ave. in Newport City, Pasay City.

 

RIZAL PROVINCE (CAINTA)

BETWEEN 10:00AM AND 2:00PM – PORTION OF CIRCUIT CAINTA 44XG

Portion of Snap Dragon St. from Lily St. to Gladiola St. including Magnolia, Mariposa, Sampaguita, Cattleya, Jasmin, Violet, Verbena, Zinia, Fancy, Aster, Rose, Orchids, Daffodil, Carnation, Dahlia, Daisy, Tulip and Dama De Noche Sts. in Midtown Subd.; and Kabisig Floodway in Bgy. San Andres.

 

REASON:     Replacement of pole along Snap Dragon St., Midtown Subd., Bgy. San Andres, Cainta, Rizal Province.

 

QUEZON PROVINCE (MAUBAN)

BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT NEW MAUBAN 41WY

Portion of Barangay Cagsiay II.

 

REASON:     Relocation of primary facilities affected by DPWH road widening project along Bgy. Cagsiay Road in Bgy. Cagsiay II, Mauban, Quezon Province.

 

WEDNESDAY TO THURSDAY, OCTOBER 25 – 26, 2017

LAGUNA (CALAMBA CITY)

BETWEEN 11:00PM (WED., 10/25/17) AND 4:00AM (THU., 10/26/17) – PORTION OF CIRCUIT CANLUBANG 55XE

Portion of M. H. Del Pilar St. from J. P. Rizal St. to and including Villa Zenaida Subd. in Calamba City proper.

 

REASON:     Various line maintenance works along M. H. Del Pilar St. in Calamba City proper, Calamba City, Laguna.

 

MAKATI CITY

BETWEEN 11:00PM (WED., 10/25/17) AND 6:00AM (THU., 10/26/17) – PORTION OF CIRCUIT KAMAGONG 41VK

Portion of Yakal St. from Talisay St. to near Chino Roces Ave. including Belton Place, E – Scribir Inc. and Philippine Business Bank in Bgy. San Antonio.

 

REASON:     Line conversion works along Yakal St., Bgy. San Antonio, Makati City.

 

LAGUNA (CALAUAN)

BETWEEN 11:30PM (WED., 10/25/17) AND 4:30AM (THU., 10/26/17) – PORTION OF CIRCUIT DILA 410DIA

Portion of Bay – Calauan Highway from A. Marfori Road to and including Calauan Health Center, Puregold Calauan, H & E Group Inc.; A. Marfori Ext., G. Medel and J. P. Rizal Sts. in Bgys. Poblacion (Kanluran), Poblacion (Silangan) and Masiit.

 

REASON:     Installation and replacement of facilities along Bay – Calauan Highway, Bgy. Poblacion, Calauan, Laguna.

 

THURSDAY, OCTOBER 26, 2017

MANILA (STA. CRUZ; AND TONDO)

BETWEEN 12:01AM AND 12:30AM AND THEN BETWEEN 4:30AM AND 5:00AM – PORTION OF CIRCUIT NORTH PORT 48H

Portion of Jose Abad Santos Ave. from near Old Antipolo St. to Solis St. including Mercury Drugstore in Tondo.

Portion of Old Antipolo St. from Jose Abad Santos Ave. in Tondo to Felix Huertas St. including SM City San Lazaro and Winford Hotel in Sta. Cruz.

 

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT NORTH PORT 48H

Portion of Jose Abad Santos Ave. from near Solis St. to Morong St. including Mitsubishi Motors and Philippine Lam-An Association Inc. in Tondo.

 

REASON:     Line reconductoring and reconstruction works along Jose Abad Santos Ave. between Solis and Corregidor Sts. in Tondo, Manila.

 

BATANGAS (STO. TOMAS)

BETWEEN 9:00AM AND 12:00NN – PORTION OF CIRCUIT CALAMBA 413CMB

Portion of San Antonio Heights Phases 1 & 2 Subd. in Bgy. San Antonio.

 

REASON:     Replacement of facilities in San Antonio Heights Phase 1 Subd., Bgy. San Antonio, Sto. Tomas, Batangas.

 

MUNTINLUPA CITY

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT FILINVEST 414FIL

Portion of Pleasant Drive and Madriñan Ave. from Muntinlupa – San Pedro National Highway to and including Pleasant Village and Purok 1 in Bgy. Bayanan.

 

REASON:     Relocation and installation of primary facilities inside Pleasant Village in Bgy. Bayanan, Muntinlupa City.

 

CALOOCAN CITY

BETWEEN 10:00AM AND 2:00PM – PORTION OF CIRCUIT CAMARIN 433TC

Portion of Bagong Silang – Kaliwa Barangay Road from Phase 10 Package 1 to and including Phase 10 Package 2 and Modern Living Subd. in Bgys. Bagong Silang – Kaliwa and Bagumbong.

 

REASON:     Line reconductoring works, installation of facilities, and replacement of poles along Blk 10, Phase 10, Package 1, Bgy. Bagong Silang – Kaliwa, Caloocan City.

 

THURSDAY TO FRIDAY, OCTOBER 26 – 27, 2017

QUEZON CITY

BETWEEN 11:00PM AND 11:30PM (THU., 10/26/17) AND THEN BETWEEN 5:30AM AND 6:00AM (FRI., 10/27/17) – PORTION OF CIRCUIT MANGGAHAN 46ZM

Portion of Greenmeadows Ave. from Parakeet St. to near Giraffe St. including Swallow St. including Ivory Court Condominium, Christ The King Parish and Quiason Makalintal Law Office in Green Meadows Subd., Bgy. Ugong Norte.

Portion of Temple Drive from near Giraffe St. to and including Manila Philippines Temple and Starbucks in Green Meadows Subd., Bgy. Ugong Norte.

Portion of Rodeo and Vicente Putat Sts. in Corinthian Hills Subd., Bgy. Ugong Norte.

 

BETWEEN 11:00PM (THU., 10/26/17) AND 6:00AM (FRI., 10/27/17) – PORTION OF CIRCUIT MANGGAHAN 46ZM

Portion of Greenmeadows Ave. from Giraffe St. to Firefly St. including Bluebird, Dove, Flamingo, Heron, Lovebird, Nightingale, Sparrow and Swallow Sts. in Green Meadows Subd., Bgy. Ugong Norte.

    

REASON:     Replacement of cracked poles, line reconductoring works and installation of additional lightning protection devices along Green Meadows Ave., Green Meadows Subd., Bgy. Ugong Norte, Quezon City.

 

CAVITE (SILANG)

BETWEEN 11:30PM (THU., 10/26/17) AND 4:30AM (FRI., 10/27/17) – PORTION OF CIRCUIT TAGAYTAY 32XS

Portion of Pulong Saging Barangay Road from JCKL Church to near Balite I Barangay Road.

 

REASON:     Line reconductoring works in Bgy. Pulong Saging, Silang Cavite.

 

FRIDAY, OCTOBER 27, 2017

BATANGAS PROVINCE (STO. TOMAS)

BETWEEN 8:00AM AND 12:00NN – THE WHOLE OF CIRCUIT MAKBAN 56MB

Batangas Paper Corporation (St. Thomas Paper) in Bgy. San Felix.

 

REASON:     NGCP preventive maintenance works along NGCP – Bay – Calamba 69kV transmission lines.

 

BATANGAS (STO. TOMAS)

BETWEEN 9:00AM AND 12:00NN – PORTION OF CIRCUIT CALAMBA 413CMB

The whole of Rancho Vista Subd. in Bgy. Santiago.

 

REASON:     Replacement of facilities in Rancho Vista Subd., Bgy. Santiago, Sto. Tomas, Batangas.

 

SATURDAY, OCTOBER 28, 2017

PASIG (PINAGBUHATAN)

BETWEEN 2:00AM AND 6:00AM – THE WHOLE OF CIRCUIT TAGUIG 45ZL

Republic Asahi Glass Corp. along M. H. Del Pilar St. in Bgy. Pinagbuhatan, Pasig City.

 

REASON:     Maintenance works in Meralco - Taguig substation.

 

MAKATI CITY

BETWEEN 9:00AM AND 4:00PM – PORTION OF CIRCUIT LEGASPI 415RA

Portion of Adelantado St. from Vicento A. Rufino St. (Herrera) to near Dela Rosa St. including Indonesian Embassy, Vernida One Condominium, Dao I Condominium, Don Pablo Bldg., Sol Bldg., Felomena Bldg., Blooming Dale Bldg., College Assurance Plan (CAP) Bldg., Zeta II Annex Bldg., ERECHEM Bldg., Trans World Trading and YSS Laboratories in Legaspi Village, Bgy. San Lorenzo.

 

REASON:     Urgent replacement of hazardous cracked poles and line reconductoring works along Adelantado St., Legaspi Village, Bgy. San Lorenzo, Makati City.

 

SUNDAY, OCTOBER 29, 2017

BATANGAS PROVINCE (BATANGAS CITY; AND SAN PASCUAL)

BETWEEN 8:00AM AND 5:00PM – THE WHOLE OF CIRCUITS NGCP – BOLBOK 32ZZ AND 33ZZ; MAHABANG PARANG 32WZ; AND NGCP – BATANGAS 58BS 

Sitio Santa Rita Ilaya in Bgys. Santa Rita Karsada and Soro Soro Karsada in Batangas City.

Portion of Batangas City – San Jose National Road from Meralco – Mahabang Parang substation to and including Sitios Kanluran, Ilaya and Ibaba in Bgys. Bucal, Concepcion and Mahabang Parang, Batangas City.

Cocochem Agro-Industrial Park and Sokamoto in San Pascual town proper.

 

REASON:     NGCP maintenance works along 69Kv NGCP Batangas – Bolboc transmission lines.

 

LAGUNA (BIÑAN)

BETWEEN 9:00AM AND 1:00PM – PORTION OF CIRCUIT STA. ROSA 2 424WL

Portion of East Science Ave. from MD Distripark Manila Inc. to Trade Ave. including Yusen Logistics Philippines Inc., Technofreeze Inc., GRM Ecozones Storage Inc. and Sunpower Philippines Manufacturing Limited in Laguna Technopark, Bgy. Malamig.

 

REASON:     Replacement of facilities along East Science Ave., Laguna Technopark, Bgy. Malamig, Biñan, Laguna.

 

BULACAN AND CALOOCAN CITY

BETWEEN 9:00AM AND 3:00PM – PORTION OF CIRCUIT MEYCAUAYAN 56YM

Portion of Perez Road from El Calmino Real Road to Babgbaguin Road including Las Villas De Sto. Niño Subd. Phase 5 A and B, Recomville and Nakasamaba Subd. in Bgys. Bagbaguin, Perez and Bagumbong.

 

REASON:     Installation of facilities along Perez Road, Bgy. Sto. Niño, Meycauayan, Bulacan.


For more information, please contact MERALCO Call Center at telephone nos. 16211 / 631-1111, fax no. 632-8554 or e-mail address callcenter.tech.assist@meralco.com.ph. Please use the Bill ID Number or Service Identification Number (SIN) indicated in your electric bills for faster resolution of inquiries.

 

For those who prefer to receive this schedule via e-mail, simply write to MERALCO at callcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule."