MERALCO Maintenance Schedule for February 19 - 25, 2018

MAINTENANCE SCHEDULE

     To carry out necessary maintenance and upgrading works on various MERALCO distribution facilities, electric service will be temporarily interrupted on the following dates and places:

MONDAY TO TUESDAY, FEBRUARY 19 - 20, 2018

LAGUNA (SAN PABLO CITY)

BETWEEN 11:00PM AND 11:59PM (MON., 02/19/18) AND THEN BETWEEN 7:31AM AND 8:30AM (TUE., 02/20/18) – PORTION OF CIRCUIT SAN PABLO II 43WJ

Portion of M. Paulino Ave. from near Francisco Balagtas Road to and including Miguel Leonor, Hermanos Belen, Marcial Alimario, E. Alvaran, C. Balverde and A. Flores Sts.; and Villa San Antonio II Subd. in city proper.

Portion of J. P. Rizal Ave. from Cosico Ave. to and including M. Basa, Andres Bonifacio, Jacinto Zamora, L. Jaena, Pedro Alcantara, P. Paterno, Padre Jose Ma. Burgos, Inocencio Barleta, Marciano Brion, Paseo De Escudero, General Miguel Malvar and Fernando Bautista Sts. in city proper.

Along Apolinario Mabini St. from J. P. Rizal Ave. to and including Dolores Road; P. S. Marino Subd., Gawad Kalinga Homes and Carmelite Subd.   in Bgys. San Buenaventura, Dolores, San Lucas 1 & 2, Sta. Catalina and city proper.

Portion of Werner Schetelig Ave. from P. Gomez St. to and including Pinaglabanan Road; NHA Housing Project, Pope Pious Village and Concepcion Village, Sampaloc Lake Court Subd., Villa Lozada Subd. and Vesco Subd. in Bgys. Sto. Angel, Sta. Isabel, Concepcion and city proper.

 

REASON:     Repair works inside Meralco – San Pablo substation.

 

TUESDAY, FEBRUARY 20, 2018

LAGUNA (CALAMBA CITY)

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUITS CALAMBA 31XO; AND CANLUBANG 47XE

Portion of Calamba – Los Baños National Highway from near Bucal Bypass Road to Garden Resort Co., Luisa Ridge Resort, Eduardo Barretto, Sr. National High School & Elementary School, Yahweh Hot Spring Resort, Iglesia Ni Cristo, Rockpoint Hotspring Resort Hotel & Spa; Barreto Subd., Bayview Subd., Laguna Hills Subd., South Spring Villas Subd., Solemar Del Pansol Subd., Villa Pansol Subd., Purok 1, 3 & 4; and Masikap St. in Bgys. Bucal, Halang and Pansol.

 

REASON:     Relocation of facilities affected by DPWH road widening project along Calamba – Los Baños National Highway, Bgy. Bukal, Calamba City, Laguna.

 

SAN JUAN CITY

BETWEEN 9:00AM AND 4:00PM – PORTION OF CIRCUIT VALENCIA 414VAL

Portion of De Rosa St. from P. Guevarra St. to near Alvir Tennis Court in Bgy. Little Baguio.

 

REASON:     Line reconductoring works along De Rosa St. in Bgy. Little Baguio, San Juan City.

 

BULACAN (NORZAGARAY; AND SAN JOSE DEL MONTE CITY)

BETWEEN 10:30AM AND 11:00AM – PORTION OF CIRCUIT SAPANG PALAY 33YO

Portion of Quirino Ave., Ipo Road and Dr. Eduardo V. Roquero Ave. from Newtown Drive in Bgy. Minuyan, San Jose Del Monte City to Ipo Dam Community, Sitio Crusher, Sitio Poblacion, Sitio Setling, Sitio Spar Bigte, Sitio Upper Bigte, Sitio Compra, Sitio Hulo, Sitio Usboy; Matandang Barrio, Pinagkamaligan and Sapang Saging Sts. in in Bgys. Bigte, Minuyan and San Mateo; Minuyan Marble Corp. and Spar Development Co. Inc. in Norzagaray; Quarry St., Roads 1 and 4 in Bgys. Minuyan and town proper in San Jose Del Monte City.

 

BETWEEN 11:01AM AND 11:30AM – THE WHOLE OF CIRCUIT SAPANG PALAY 34YO; AND PORTION OF CIRCUIT SAPANG PALAY 33YO

Portion of Road 1 and Citrus Road from Meralco – Sapang Palay substation to near Roquero Hospital including San Jose Del Monte Water District Pump in San Jose Del Monte City.

Portion of Bagong Buhay Provincial Road from Maginhawa St. to Sto. Domingo St. including Maginhawa, Maliwanag Sts. and Road 1 in Bgys. San Pedro, Minuyan proper, Tungkong Mangga, Fatima and Sto Cristo in San Jose Del Monte City.

Portion of Road 1 from Quirino Ave. to Road 10 including San Jose Del Monte Water District Head Officein Bgy. Minuyan proper, San Jose Del Monte City.

Portion of Road 12 and Dr. Eduardo V. Roquero Ave.  from Road 10 to San Jose – Norzagaray Road including Defense Village, Purok 8 – 12; Matiyaga, Milflores, Ilang – Ilang, Tanguile, Morning Glory, Waling – Waling, Pag-asa, Mapagmahal and Amethy Sts.; in Bgys. Bagong Buhay, Minuyan III & IV, San Martin IV, Sta. Cruz IV & V, Sto. Niño II and Tigbe in Norzagaray.

Portion of San Rafael Ave. from Dr. Eduardo V. Roquero Ave. to San Jose – Norzagaray Road including Sitio Hulo; M. A. Roxas and Pres. Garcia Sts.; San Jose Del Monte Kooperatiba ng Bayan in Bgys. San Rafael I – IV and Sapang Palay in San Jose Del Monte City.

Portion of San Jose – Norzagaray Road from San Rafael Ave. to and including Tigbe Chapel; FVR Homes, Sitio Gulod, Sitio Kay Piskal, Sitio Sulucan II; and P. Dela Merced St. in Bgys. Poblacion and Tigbe in Norzagaray.

 

REASON:     Line reconstruction works at various in Bgy. Minuyan, San Jose Del Monte City, Bulacan.

 

TUESDAY TO WEDNESDAY, FEBRUARY 20 – 21, 2018

LAGUNA (LILIW; NAGCARLAN; RIZAL; MAGDALENA; AND MAJAYJAY)

BETWEEN 11:00PM AND 11:59PM (TUE., 02/20/18) AND THEN BETWEEN 7:01AM AND 8:00AM (WED., 02/21/18) – THE WHOLE OF CIRCUIT BOTOCAN 41D

Portion of Majayjay – Liliw Municipal Road from Meralco – Botocan substation to and including the whole towns of Liliw, Nagcarlan, Rizal and Magdalena; Bgys. Bukal, Coralao, Ibabang Banga, Ilayang Banga, Malinao, May-it, Munting Kawayan, Olla, Oobi, Pangil, Panglan, San Isidro, Sta. Catalina, Suba and Talortor in Majayjay.

 

REASON:     Preventive maintenance and testing works inside Meralco – Botocan substation.

 

VALENZUELA CITY (PASO DE BLAS; AND MAPULANG LUPA)

BETWEEN 11:00PM (TUE., 02/20/18) AND 4:00AM (WED., 02/21/18) – PORTION OF CICUIT BAGBAGUIN 414YZ

The whole of De Castro Subd. and Purok 4 in Bgys. Paso De Blas and Mapulang Lupa.

 

REASON:     Relocation of primary facilities to new pole along De Castro St. in De Castro Subd., Bgy. Paso de Blas, Valenzuela City.

 

WEDNESDAY, FEBRUARY 21, 2018

MAKATI CITY (MAGALLANES)

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT MALIBAY 413VJ

Portion of Victoria St. from Security Bank to Midland Bldg. in Magallanes Village.

 

REASON:     Line reconductoring works along Victoria St. in Magallanes Village, Bgy. Magallanes, Makati City.

 

MAKATI CITY (POBLACION)

BETWEEN 9:30AM AND 4:30PM – PORTION OF CIRCUIT NEW ROCKWELL 421VV

Portion of R. Palma St. from J. D. Villena St. to Rockwell Drive including Polytechnique Manufacturing Incorporated.

Portion of Gabaldon St. from R. Palma St. to near J. D. Villena St.

Portion of Manalac St. from R. Palma St. to near J. D. Villena St.

 

REASON:     Line reconductoring works and installation of additional lightning protection devices along R. Palma St. in Bgy. Poblacion, Makati City.

 

RIZAL PROVINCE (CAINTA)

BETWEEN 10:00AM AND 3:00PM – PORTION OF CIRCUIT TAGUIG 49ZL

Portion of Palm St. from Chestnut St. to and including Daites, Alwood, Sandalwood, Sherwood, Holywood and Cacao Sts. in Phase 6, Greenwoods Executive Village.

 

REASON:     Line reconductoring works, installation of lightning protection device and replacement of several hazardous and sub – standard poles along Palm St., Phase 6, Greenwoods Executive Village, Cainta, Rizal Province.

 

WEDNESDAY TO THURSDAY, FEBRUARY 21 – 22, 2018

MAKATI CITY

BETWEEN 11:30PM (WED., 02/21/18) AND 5:30AM (THU., 02/22/18) – PORTION OF CIRCUIT MAKATI 43G

Portion of Sen. Gil Puyat Ave. (Buendia Ave.) from Bautista St. in Bgy. Palanan to Dӧhle Haus Manila in Bgy. San Isidro.

 

REASON:     Replacement of primary lines along Sen. Gil Puyat Ave.

     (Buendia Ave.) in Bgy. Palanan, Makati City.

 

THURSDAY, FEBRUARY 22, 2018

BULACAN (BULAKAN)

BETWEEN 12:01AM AND 5:00AM – PORTION OF CIRCUIT SAOG 412SAO

Portion of Bulakan – Malolos Provincial Road from near Marcelo H. Del Pilar Memorial School to Bayan Gas Corp. in Bgys. San Nicolas, Pitpitan and Tibig.

 

REASON:     Replacement of badly leaning pole along Bulakan – Malolos Provincial Road in Bgy. San Nicolas, Bulakan, Bulacan.

 

MANILA (STA. CRUZ)

BETWEEN 8:30AM AND 2:30PM – PORTION OF CIRCUIT NORTH PORT 18H

Portion of Blumentritt St. from Caltex Gas Station to A. Bonifacio Ave. including Manila North Cemetery.

Portion of A. Bonifacio Ave. from Blumentritt St. to near Mariveles St.

 

REASON:     Conversion of portion of 6.24kV circuit North Port 18H to 34.5 kV electric system in Sta. Cruz, Manila.

 

FRIDAY, FEBRUARY 23, 2018

PASAY CITY

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT MALIBAY 413VJ

Portion of Aurora Blvd. from Stone House Hotel to and including The Wine Museum Hotel & Resto.

 

REASON:     Line reconductoring works along Aurora Blvd. in Pasay City.

 

BULACAN (MEYCAUAYAN CITY)

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT MEYCAUAYAN 56YM

Portion of St. Peter St. from Cancer St. in Phase III – B to St. Anthony St. including St. John, St. Julian, St. Michael, St. Luke, St. Therese, St. Jude, St. Catherine and St. Vincent Sts. in Phase III – A, Sto. Niño Village, Bgy. Perez.

The whole of Phase III – D, Sto. Niño Village in Bgy. Perez.

 

REASON:     Replacement of rotten wood poles and line reconductoring works along St. Peter St., Phase III – A, Sto. Niño Village, Bgy. Perez, Meycauayan City, Bulacan.

 

LAGUNA (STA. ROSA)

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT BALIBAGO 42XV

Buena Rosa 9 Subd., Rosemont Ville Subd. and Sta. Rosa Garden Villas II Subd. in Bgy. Macabling.

 

REASON:     Upgrading of facilities in Purok 3, Bgy. Macabling, Sta. Rosa, Laguna.

 

MANDALUYONG CITY (PLAINVIEW)

BETWEEN 9:30AM AND 4:30PM – PORTION OF CIRCUIT NEW ROCKWELL 412VV

Portion of San Rafael Ext. from San Rafael St. to near San Miguel St.

 

REASON:     Line reconductoring works, installation of additional lightning protection devices and replacement of rotten poles along San Rafael Ext. in Bgy. Plainview, Mandaluyong City.

 

SATURDAY, FEBRUARY 24, 2018

VALENZUELA CITY

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT BAGBAGUIN 422YZ

Portion of Fortune St. from D. Bonifacio St. to and including Fortune Net & Twine Manufacturing Corp. and Formtech Inc. in Bgy. Canumay (East).

 

REASON:     Replacement of poles along Fortune St. in Bgy. Canumay (East), Valenzuela City.

 

MUNTINLUPA CITY (ALABANG)

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT AYALA ALABANG 425WR

Portion of Sanggumay St. from Paref Woodrose School to near Bougainvilla St. in Ayala Alabang Village.

 

REASON:     Replacement of badly leaning pole, relocation of 20kV line and line reconductoring works along Sanggumay St. in Ayala Alabang Village, Bgy. Alabang, Muntinlupa City.

 

TAGUIG CITY; AND PASIG CITY (KALAWAAN)

BETWEEN 9:00AM AND 5:00PM – PORTION OF CIRCUITS TAGUIG 46ZL AND 50ZL

Portion of Elisco Road from Meralco – Taguig substation in Bgy. Kalawaan, Pasig City to Dr. Natividad Ave. in Bgy. Ibayo-Tipas, Taguig City.

Portion of Dr. Natividad Ave. from Elisco Road to near Italit Road in Bgys. Ibayo-Tipas and Napindan, Taguig City.

Portion of Mabato Road from Dr. Natividad Ave. to and including Katuiran Road; and Samama Phase 2 Subd. in Bgys. Ibayo-Tipas and Napindan, Taguig City.

 

REASON:     Line reconductoring works and replacement of poles in Bgys. Ibayo-Tipas and Napindan, Taguig City.

 

SUNDAY, FEBRUARY 25, 2018

PASAY CITY

BETWEEN 8:00AM AND 1:00PM – PORTION OF CIRCUIT MALIBAY 413VJ

Portion of 3rd St. from near 10th St. to 2nd St. including 1st St. in Villamor Air Base.

Along 4th St. from 3rd St. to 19th St. including 4th, 5th, 6th, 7th, 9th, 13th and 17th Sts. in Villamor Air Base.

 

REASON:     Replacement of rotten pole and line reconductoring works along 10th St. corner 3rd St. in Villamor Air Base, Pasay City.

 

PARAÑAQUE CITY

BETWEEN 9:00AM AND 2:00PM – PORTION OF CIRCUIT GARDNER 47GG

Basic Box Industries Corp. along Dr. A. Santos Ave. in Bgy. BF Homes.

 

REASON:     Line reconductoring works along Dr. A. Santos Ave., Bgy. BF Homes, Parañaque City.

For more information, please contact MERALCO Call Center at telephone nos. 16211 / 631-1111, fax no. 632-8554 or e-mail address callcenter.tech.assist@meralco.com.ph. Please use the Bill ID Number or Service Identification Number (SIN) indicated in your electric bills for faster resolution of inquiries.

 

For those who prefer to receive this schedule via e-mail, simply write to MERALCO at callcenter.tech.assist@meralco.com.ph and type in the phrase "Request for weekly schedule."