Given the country's vast hydropower potential, more than 10 percent
of electricity requirements will be supplied by hydropower generation.
To meet the expected increase in demand for power over the planning
period, a total of 2,950 MW of hydropower capacity will be available
within both grid and off-grid areas. Committed and indicative capacity
additions will increase overall hydropower available capacity to
5,468 MW from the current installed capacity of 2,518 MW (Table
5). Eighteen (18) large hydropower potentials are estimated to account
for more than 90 percent of the possible additional capacity while
the remainder will be supplied by mini-hydro potentials. In addition,
490 kW of micro-hydro power plants are targeted for installation
for the planning horizon. These micro-hydropower plants will be
tapped to support the government's rural electrification program
targeting 100 percent barangay (or village) electrification by 2006.
The committed capacity addition is expected to provide 7.7 TWh of
electricity per year equivalent to a fuel oil displacement of 12.9
MMBFOE.
Hydro plants are classified based on their capacities, as follows:
(i) micro-hydro - 1 to 100 kW; (ii) mini-hydro - 101 kW to 10 MW;
and (iii) large hydro - more than 10 MW. The total untapped hydropower
resource potential of the country is estimated at 13,097 MW, of
which 85 percent are considered large and small hydros (11,223 MW),
14 percent (1,847 MW) are classified as mini-hydros while less than
1 percent (27 MW) are considered micro-hydros. Some projects in
Luzon are available for private financing, while 20 are undergoing
feasibility studies and 82 are in the pre-feasibility stage.
Potential sites for mini and micro-hydro projects are evenly distributed
in all the regions. The National Electrification Administration
(NEA), National Power Corporation (NPC) and the DOE have studied
specific mini-hydro potential sites and have lined them up as indicative
projects. The NEA has identified about 1,000 mini-hydro potential
sites for development based on its mini-hydro program which began
in the 1980s. Likewise, NPC has identified potential sites for mini-hydro
development. In 1995, the DOE conducted a water resource inventory
study to validate NEA's and NPC's identified potential sites for
promotion to private investors. Meanwhile, a study conducted by
United States National Renewable Energy Laboratory (US-NREL) likewise
revealed that micro-hydro potential sites are well distributed all
over the regions (Figure 7). Local government units (LGUs), non-government
organizations (NGOs), electric cooperatives (ECs), and DOE's Affiliated
Non-Conventional Energy Centers (ANECs) supported the study by conducting
local identification projects. Another study entitled "Micro-hydropower
Development Study for Unenergized Barangays" is a Japanese-funded
project which aims to identify at least 40 micro-hydro sites for
development in Regions I, II, III and Cordillera Autonomous Region
(CAR).
Challenges and Gaps
The capital-intensive nature, long gestation period (average of
seven years) and accompanying issues of social acceptability of
large hydropower projects remain to be the sector's biggest challenges.
On the other hand, micro-hydro development for off-grid electrification
is hindered by high upfront costs and the need for government intervention
and subsidy.
Socio-environmental concerns
There is considerable resistance to the further development of
large hydropower projects due to the potential for upstream flooding,
destruction of agricultural areas and animal habitat and disruption
of communities in the affected areas. These factors have affected
the attractiveness of large hydropower projects.
Shift in type of development
Given the many issues plaguing large hydropower projects, the
logical next step would be to focus on smaller, more manageable
run-of-river projects. However, such a shift will not come without
considerable challenges such as a decrease in new capacity given
the smaller scale of the projects, intermittent supply of power
and considerable decrease in power generation during the summer
months.
Commercialization of local micro-hydropower technology
There is also a need to develop and commercialize suitable micro-hydro
technology in the Philippines even as hydropower technology for
large and small projects is proven and mature. The Philippines
remains to be dependent on imported electro-mechanical equipment
for micro-hydro projects. The costs of these equipment vary based
on kilowatt capacity. For instance, a 5-kW equipment with controls
and metering devices cost US$11,000 while a 100-kW equipment costs
US$64,500.
Existing Incentives
Republic Act No. 7156 or the Mini-Hydro Law provides
the following rights and privileges of mini-hydro developers, as
follows:
- Special privilege tax rates - Tax payable by developers/grantees
to develop potential sites for hydroelectric power and to generate,
transmit and sell electric power shall be 2 percent of their gross
receipts
- Income tax holiday for seven (7) years from start of commercial
operations
- Tax and duty free importation of machinery, equipment and materials-
Exemption from payment of tariff duties and value-added tax (VAT)
on importation of machinery and equipment (within seven (7) years
from date of awarding of contract)
- Tax credit on domestic capital equipment - For developers who
buy machinery, equipment, materials and parts from a local manufacturers,
tax credit is given equivalent to 100 percent of value of VAT
and custom duties that would have been paid to import said machinery,
equipment, etc.
- Special realty tax rates on equipment and machinery - Realty
and other taxes on civil works, equipment, machinery and other
improvements of a registered mini-hydroelectric power developer
shall not exceed 2.5 percent of their original cost
- VAT Exemption - Exemption from payment of 10 percent VAT on
gross receipts derived from sale of electric power whether wheeled
via the NPC grid or electric utility lines
Programs and Projects
To address the three major challenges for this sector, the DOE
will pro-actively monitor existing hydropower plants in the Philippines.
Enhanced public acceptance
The DOE shall involve all stakeholders in the decision-making
processes prior to the implementation of hydropower projects.
This would ensure protection of the rights of communities which
may be affected by specific projects. At the same time, project
risks will be easier to ascertain through consultations and social
assessment activities conducted jointly with all affected stakeholders.
Promotion of alternative hydro development
The run-of-river schemes of construction will allow for a balance
of river ecosystems while providing communities dependent on the
river for their livelihood to co-exist with hydropower projects.
In addition, the government would place greater emphasis on projects
which are encountering social and environmental problems by treating
these issues as an integral element, along with economic and financial
concerns, in the decision making process.
Commercialization of hydropower technology
With additional incentives as stipulated in the proposed Renewable
Energy Bill, the commercialization of locally made hydropower
equipment can be attained. The following measures are proposed
to hasten its commercialization:
Creation of hydropower database
The DOE is envisioned to be the central repository for a database
of large, small, mini- and micro-hydropower projects and prospects.
This database shall be made available to interested developers.
Furthermore, the DOE will conduct annual seminars and workshops
on hydropower development in strategic locations to promote attractive
hydropower projects to private investors.
Pursuit of technical cooperation with other countries
For small-scale hydropower development, the basic strategy for
commercialization is to encourage electro-mechanical manufacturers
to set up facilities in the Philippines and reduce the cost of
importation of turbine equipment. There are several local turbine
fabricators in the country that can be trained to enhance their
capability to manufacture turbine equipment. The DOE is pursuing
a technical experts' dispatch program with the Japan International
Cooperation Agency (JICA) to assist these local fabricators. In
coordination with the De La Salle University, the DOE through
JICA established the Micro-Hydro Testing Center in April 2003
to help improve the output and efficiency of these equipment.
The DOE will likewise continue to seek technical and bilateral
cooperation with other countries that offer the latest expertise
and technical transfer of hydropower technology to replicate the
successful Mahagnao micro-hydro demonstration project. The 65-kW
demonstration project in Burauen, Leyte showcases the reliability
of the hydropower system to supply electricity in remote barangays
located outside the grid. It is designed to supply power to 300
households in the three barangays of Burauen namely, Cansiboy,
Logsongan and Mahagnao. The achievement of this project will be
replicated in other suitable sites in the country. The said demonstration
project was successful in terms of seeking bilateral cooperation
with the Japanese government and a successful collaboration with
other government agencies in the country which were the key to
the project's implementation.
Rehabilitation program for existing hydropower plants
The DOE shall encourage investors to rehabilitate inefficient
and non-operating but viable plants to increase their generation
capacities. Nationwide promotional activities such as seminars
and investment clinics will be conducted towards this end. One
such seminar was conducted in December 2002 in Tacloban City in
cooperation with JICA to promote the rehabilitation of existing
mini-hydro plants in Samar and Leyte to interested investors.
The rehabilitation plans for hydropower plants are spread over
the ten-year period.
|